Published: 13 July 2014
Ensuite shower has been relined and waterproofed and now needs tiling. I have purchased the tiles and they will be available around the 21st of July. The floor is being retiled over existing tiles that have had waterproofing over the top of them. I estimate less than 2 days work to complete. Shower is 1050mm x 1200mm sq x 2700 high. A new glass door will be installed by a separate contractor
Workmanship |
3.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
4.5
|
The job has been completed. Overall the finish is really good. On arrival they had an issue with the shower waste. I hade specified that the job required it to be raised and provided detail photos. They said it couldn't be done. We talked through it and agreed on a plan. The finish to the waste was not good and not to request so they revisited within one day and rectified to my satisfaction. Good guys to deal with and I would use again.
Work carried out by the owner/operator
Reviewed on 13-08-2014
Tradesperson reply
"anyway thanks
"
Partner with Builderscrack
Get work