Published: 7 January 2020
We are having a new kitchen installed and would like tiles installed on the walls along the benchtop and behind the oven area. Kitchen installation is 10 Feb, so availability soon after that would be best.
#1 | Tradie 1 |
|
157 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 14 jobs | No longer in contact |
#3 | Tradie 3 |
|
347 jobs | No longer in contact |
#4 | Tradie 4 |
|
59 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 26 jobs | No longer in contact |
#6 | Tradie 6 |
|
35 jobs | No longer in contact |
#7 | Tradie 7 |
|
180 jobs | No longer in contact |
#8 | Tradie 8 |
|
114 jobs | No longer in contact |
Partner with Builderscrack
Get work