Published: 12 August 2019
We need to strip off old vynil and tile floor and walls in the bathroom (4 m2). After that install new bath, toilet and vanity. All materials are supplied. The kitchen needs tiling as well (approx. 6m2). The job is URGENT and needs to be done ASAP, ideally this week.
#1 | Tradie 1 | No recent reviews | 2 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 28 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 26 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 6 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 5 jobs | No longer in contact |
#6 | Tradie 6 |
|
59 jobs | No longer in contact |
Partner with Builderscrack
Get work