Published: 5 August 2019
Floor: around 20m2 of new floor tiles ( --- woodgrain porcelain) to be laid and grouted. Around 15m2 over existing lino underlay - lino has been lifted and skirtings removed. Some 5m2 still carpeted so new underlay required. Must be finished by next Friday, 16/8. Walls: 45m2 of white --- ceramic tiles to go over existing gib board. 10m2 to be finished by 16/8, the balance can wait. Includes a tiled shower - acrylic base and wall membrane applied so all ready to go.
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
4.0
|
Communications |
4.0
|
Work carried out by the owner/operator
Reviewed on 07-09-2019