Published: 11 February 2019
Uplift 6 m2 of --- ceramic floor tiles from kitchen floor, grind off bedding mortar to concrete floor slab, ready for pvc planking (to be laid by others). Existing kitchen cabinetry already removed. must be done before Friday 15 Feb.
#1 | Tradie 1 |
|
347 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 0 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 32 jobs | No longer in contact |
#4 | Tradie 4 |
|
12 jobs | No longer in contact |
Partner with Builderscrack
Get work