Published: 3 May 2017
Need floor and wall tiled for bathroom and separate toilet. Both have been already stripped down, plumbing done and about to be plastered in prep for tiler. Tiler also need to screed and make base for --- frameless shower. This is part 1 as we also have an ensuite that will be part2 and need to be done when we have fully completed the reno in part 1 as we need to have a toilet to use. Job is time and cost sensitive as the original tiler cannot do the job because he has to go back to Phillapines for a funeral.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
4.0
|
Communications |
4.0
|
thank you Deric and his team. Top quality work. Very clean and attention to detail. Always accomodating with unexepected changes and adjustment. Very happy and will use again. Highly recommend.
Reviewed on 21-07-2017
Partner with Builderscrack
Get work