Published: 9 February 2016
Hi there we have a new minor dwelling with a separate toilet which needs to be waterproofed and tiled on the floor and halfway up the walls. The bathroom also needs to be waterproofed and tiled on the floor and up the walls and the 1 metre square shower area needs to be built up from the concrete floor. We need the whole place completed by mid March so would need to be able to start in a couple of weeks.
#1 | Tradie 1 | No recent reviews | 64 jobs | No longer in contact |
Partner with Builderscrack
Get work