Published: 7 March 2022
We are having a ceramic toilet removed and want to get the wall behind it tiled after removal and before the new one is installed. We are trying to get it all done in one day if possible so the old loo will be removed early and the new one installed at the end of the day. The total tiling area is only about 900mm x 1m and we have the tiles ( --- ). The tiles would need to be keyed into the skirting board (ideally) and we will add a wooden border at the top to match the next door bathroom.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Only a small job but comms were smooth and costing provided quickly. Had to work timings in with the plumber, but that was no problem. The job was completed quickly and for cost. Very happy with the result.
Work carried out by the owner/operator
Reviewed on 29-03-2022
Tradesperson reply
"Thank you very much, it was a pleasure to do your work."
Partner with Builderscrack
Get work