Published: 7 June 2024
Hi there, we had an internal access way reinstated with blockwork. The blockwork isn’t flush so you can see where the entrance was. See picture. I’m now querying if this needed to be consented? Would we need to re-do it to have a COA obtained in the future? Many thanks
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
The team did a great job - thanks so much!
Work carried out by the owner/operator
Reviewed on 13-07-2024
Partner with Builderscrack
Get work