Published on 21 December 2023
We have a 1950s house with a corrugated iron roof. The roof needs cleaning, a small amount of rust treatment and priming, and repainting. The house is a simple hip roof of four sections. The roof is approximately 9m x 9m. The metal all seems to be in OK condition. The job can be done whenever suits.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
The job involved preparing an old painted roof for repainting (moss removal, rust treatment, scraping back peeling paint, and priming) then two top coats of paint. Everything went very well. Communications were great, work was done exactly as outlined, and quality was good. Recommended!
Work carried out by the owner/operator
Reviewed on 15 March 2024
Partner with Builderscrack
Get work