Published: 13 May 2024
This job is exclusively for someone who has a harness and can use it. The roof is too steep to get to the leak any other way. The harness can be tied to joists on the other side of the building. NOT seeking scaffolding. Another option is a latter that can hook over the peak of the roof.
#1 | Tradie 1 |
|
77 jobs | No longer in contact |
#2 | Tradie 2 |
|
50 jobs | No longer in contact |
#3 | Tradie 3 |
|
221 jobs | No longer in contact |
#4 | Tradie 4 |
|
93 jobs | No longer in contact |
Partner with Builderscrack
Get work