Published: 1 December 2023
Hi there, I have a reno underway with scaffolding in place to 6m in required locations so easy access to job area. Before it comes down there is an opportunity next week to reinstate 2 copper gutters and alter to length required (mostly using existing materials being stored on site) and reinstate 1 copper downpipe (also in storage onsite). I need someone available nex tweek who is skilled joining copper gutters , preferably by soldering\brazing method , or who has spare short lengths of matching copper gutter material to allow a less desirable riveting approach.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Copper spouting extension (older variant cross section) and downpipe adjustment and refitting. Not a simple job as some custom factory work was needed with a few timing and interworking with other trade challenges (i.e. building , stormwater and cladding contractor) but Warren persevered with sound design sense and completed the job to both look good and meet required standards.
Work carried out by the owner/operator
Reviewed on 17-06-2024
Partner with Builderscrack
Get work