Published: 6 February 2022
Hello We have just had some scaffolding put up to re stain our house and this has allowed us to check the guttering, we require some 3 things to be done 1) we need a new connection from the guttering to an unused down pipe 2) we need about 4 clips to be replaced that hold up the 2 of the gutters 3) we need a new down pipe - from one roof to another on a 90 degree angle Please note we only have the scaffolding up for 2 weeks so we need some one asap The down pipes are rectangular and we want it to match the existing down pipes Job should only take a few hours for someone that knows what they are doing. I have photos of everything and can send as soon as connect it made via text Thanks
#1 | Tradie 1 |
|
66 jobs | No longer in contact |
#2 | Tradie 2 |
|
37 jobs | No longer in contact |
#3 | Tradie 3 |
|
47 jobs | No longer in contact |
Partner with Builderscrack
Get work