Review

New guttering

Job description

Metal Spouting & Downpipes
North Shore

Published: 12 October 2014

I have two lengths of guttering, each approx 8m in length that slope away from their downpipes causing the guttering to fill and overflow down the side of the house. I need the guttering to slope towards the existing downpipes. The guttering is in ok condition but may need replacing. One part of the guttering is not that accessible as it the deck stops about 2m from the end of the guttering. I would like some sort of leaf guard installed over the guttering.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Johan came around to the property to assess the job in person and provided a practical and competitive quote. He completed the messy job with professionalism and cleaned up afterwards. Johan and Olga kept me updated as to when Johan would be at the property. Thanks.

Work carried out by the owner/operator
Reviewed on 24-10-2014

Verified Builderscrack review

Trade professionals

#1 Tradie 1
161 jobs Secured job
#2 Tradie 2 No recent reviews 34 jobs No longer in contact
#3 Tradie 3 No recent reviews 47 jobs No longer in contact
#4 Tradie 4 No recent reviews 0 jobs No longer in contact
#5 Tradie 5
123 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo