Published: 7 December 2021
Replace one sheet of colorsteel (aprox 4M) together with some ridge capping and flashing. Roof is low pitch and one story at this point. Would like work done late January. Reason for work : low pressure hot water overflow has caused corrosion since replaced with mains pressure system.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
A small repair job done with enthusiasm.
Work carried out by the owner/operator
Reviewed on 11-03-2022