Published: 4 June 2021
Hello We require new guttering and down pipes on units 4 & 5 on the back yards side of the property. The new guttering will need to go around the back doors areas as well as along the normal roof line - if that makes sense. Unit 6 will require a new down pipe as well - but this should connect with the new guttering. All can be done on a ladder as it is only 1 and a bit stores up. We want the guttering to match the current guttering - replaced 18 months ago. Shouldn't be too hard but would be best to discuss as one of the down pipes needs to connect to unit 3 down pipe.
#1 | Tradie 1 |
|
79 jobs | No longer in contact |
#2 | Tradie 2 |
|
161 jobs | No longer in contact |
#3 | Tradie 3 |
|
76 jobs | No longer in contact |
#4 | Tradie 4 |
|
26 jobs | No longer in contact |
#5 | Tradie 5 |
|
37 jobs | No longer in contact |
Partner with Builderscrack
Get work