Published: 17 March 2018
The guttering on the 2 sides of my brink & tile unit needs replacing or reinstalling. One size is old metal guttering that needs replacing with PVC, the other side is PVC that needs to be reinstalled properly. Spouting/down pipes need to be installed in 2 locations. A drip edge may also need to be stalled in some parts. Each side is approx 11.5m in length
#1 | Tradie 1 | No recent reviews | 43 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 13 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 39 jobs | No longer in contact |
#4 | Tradie 4 |
|
158 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 12 jobs | No longer in contact |
Partner with Builderscrack
Get work