Published: 4 May 2024
The four barge boards need replacing. Wooden and 2 at each end of the house. The iron edging covers them, so that needs to be lifted and put back down after.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
The schedule rating doesn't have, all fine. It was all fine. The cost was as expected cheaper than a previous quote I had, from another builder. Definitely would get him back to do more work.
Work carried out by the owner/operator
Reviewed on 11-05-2024
Partner with Builderscrack
Get work