Published on 4 September 2019
Looking to have the roof and exterior painted within the next 4 months. I understand that this will be a challenging job, with the roof pitch and height. The job will require scaffolding, please be prepared to quote this also. Last painted in 2008. Appears to be only a single coat on both the roof and walls. See photo of leftover roof paint. Looking to keep the same colours. Walls are "quarter Mondo" according to the previous owner. Roof is "federation grey" according to the paint can. Roof is in good condition, nailed but no leaks. Metal gutters appear to be in ok condition, but paint blistering on the underside. Please also remove sky dish and patch holes. Full prep and two coats of paint all round. Thanks for considering this job.
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
4.0
|
Work carried out by the owner/operator
Reviewed on 22 January 2020
Partner with Builderscrack
Get work