Published: 23 September 2017
Cabinet refaced and doors repaired or replaced ( about 1900mm), bath repainted, possible tiles repainted or replaced. Skirting board put in and floors re carpeted, walls replastered and repainted in bathroom and toilet, toilet replaced and skirting boards put in toilet and carpet replaced.
Partner with Builderscrack
Get work