Published on 5 January 2025
3 renovate shower jobs, will strip out and level ready for tiling, 1 at a time so that we have a functional shower working, starting with guest room picture 1 alcove, main bathroom picture 2 and lastly main bedroom. thinking pebble mosaic shower floors with large tiles walls. as seratone showers are falling apart they are urgent where the last is likely more complicated for us to prepare. first 2 are 900s last is 1.2x1 with seat and rail so it will last into our old age. this is part of a water system change from low to high, and revamping the whole main bathroom. whereas the others are more progressive. i will be pulling out the first in the next couple of weeks we have a tank coming 28th Jan and will likely have the plumber out then or shortly after to adjust shower head placement. cost is important but so is quality. I do a lot of DIY but desire a good quality finish. regards jacqui hahn
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Originally had quote for just 3 showers without insets, added a bath surround and vanity splash-backs which of increased the cost of course. We did the pre lining, and got a specialist in to install the doors, the tapware mixers gave only a 3mm clearance which Zane achieved every time. Which our plumber prewarned us about so I was sure to let Zane see for the best outcome. There was an issue around the bath soap box.. a tile strength fault that he got discounted for us as well.
Work carried out by the owner/operator
Reviewed on 28 March 2025
Partner with Builderscrack
Get work