Complete renovation, remove existing, replace bath, shower & wooden sub-floor under shower, toilet, fixtures & fittings, lay waterproof laminate flooring, tile walls. Replacement products can be purchased before start of job, so estimate can be for labour only if necessary. We can do initial demo & painting of walls above tile level. Towel rail to be replaced, all other lighting & electrics remain.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Adam & his trades attention to detail is excellent. The tilers work is incredibly accurate. The costing was open & accurate. The job was finished ahead of schedule as the guys put in so many late hours to get things done before the lockdown - much appreciated. Excellent communication from start to finish. Amazing result, awesome work, highly recommended!
Work carried out by the owner & subcontractors
Reviewed on 18-05-2020