Published: 20 November 2017
We are wanting to renovate our existing bathroom before Christmas. -remove wall (not structural) between toilet and bathroom to create one large area -aqualine all walls -replace existing toilet, vanity, shower over bath with new -replace existing door with a sliding door -add extraction fan and heat lamp unit -will need electrician to install new lighting and plugs -possible tiling above vanity and in shower
#1 | Tradie 1 | No recent reviews | 6 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 25 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 4 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 54 jobs | No longer in contact |
#5 | Tradie 5 |
|
61 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 30 jobs | No longer in contact |
Partner with Builderscrack
Get work