Published on 15 May 2024
Remove small corner Basin, bathroom cabinet and tiles 2 high above the Basin. Taps have been disconnected and removed.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Very friendly and capable. Great communication and responsed very quickly.
Work carried out by the owner/operator
Reviewed on 28 May 2024
Partner with Builderscrack
Get work