To remove old shower and water damaged flooring. Replace floor with H3 plywood and reline 2 walls for new shower. Line with hardieglaze wet lining. The floor under the shower require replacement (due to water damage). Some of the tiles around the shower will also require replacement (either tile or some lino). I will provide shower unit and material ( likely will get it from Bunnings). Happy to discuss over the phone. Aiming to view work next week Monday and starting same day, if possible. Price negotiable.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
excellent, no concerns about job done. very professional and would strongly recommend to others.
Work carried out by the owner/operator