Published: 26 June 2024
This is a small bathroom renovation - vanity, cupboard and tiles only. 1. Provide and lay new floor underlay 2. Tile walls and floor 3. Install new toilet roll holder
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
4.0
|
Overall I was happy with the job and the work. JC has a pretty good attitude and he tries to listen. There were a few small things that I have to deal with at the end, but in the big scheme of things these are minor. Ie: there’s a small gap at the bottom of the cabinet that still needs filling, the window frame looks slightly tatty, the Matai floor outside the bathroom looks a bit scuffed, I have to break up the leftover underlay myself to get it into the bin bag.
Work carried out by the owner/operator
Reviewed on 07-07-2024
Partner with Builderscrack
Get work