Looking to appoint Qualified Builder to work in conjunction with Plumber/Tiler/Decorator to: Dismantle and remove existing flooring & fittings in an upstairs bathroom. Alter existing plumbing to accommodate new fittings & flooring . Ceramic tiling on floor (allow for underfloor heating) and partial wall tiling (see plans) Install all new bathroom fittings and complete the finishing process - including joinery and re-decoration. Please note that client has a reasonable set of detailed drawings which clearly indicate what is required - including the list the new fixtures & fittings. Upon agreement of cost and timeframe for the total job - the job management and construction shall be in the hands of the principal tradesman. Please see set of photos / video of existing bathroom as well as set of simply details drawings of the new layout. Please note the Builder could be multi trade individual - or can work in conjunction with other trades as a Team. The total cost is for labour and materials agreed prior to commencement. Happy to discuss ideas at any time.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Unfortunately the lockdown has delayed the completion and sign off for the Bathroom Renovation but we are not far away. Bracey Builders have been excellent throughout. Dylan has ensured quality work throughout and has been an absolute pleasure to deal with. Any issues that arose during construction have been discussed in a pleasant manner and amendments have been implemented immediately - always to a high standard. I've no doubt that the completion of the project shall continue in a similar way
Work carried out by the owner & subcontractors
Reviewed on 30-08-2021
Tradesperson reply
"Cheers Willy. It's been a pleasure, hopefully I can get those finishing touches underway as soon as possible.
Regards
Dylan"
Partner with Builderscrack
Get work