Replace ceiling and re line with gib. Remove bath tub. Remove existing bathroom tiles completely. No replacing these. Replace bathroom sink. Install 3 sided shower cubicle. Line wet area with ACP, no tiles. Reline existing walls with ACP. Replace existing shower head with handheld shower slide rail. Remove wall separating toilet and bathroom to combine both areas. Remove one door and replace with wall. Install extractor fan and power outlet.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Ron is an excellent professional with a methodical approach to his work. Highly recommended tradesman.
Work carried out by the owner/operator
Reviewed on 25-07-2019
Partner with Builderscrack
Get work