Published on 12 October 2023
1. Main Bathroom • Replacement of vanity, wall hung with a wrapped melamine finish, not edge banding laminate. • New tap wear installed. • Check for moisture damage of walls around bathtub and shower. • Check condition of shower and bathtub cradle • Strip wallpaper, seal and repaint. 2. Removal of old gas heater in lounge, fill in wall holes. (Gas has been disconnected). 3. If possible, repair/replacement of peeling laminate door in kitchen. • Check condition of kitchen cupboards and doors, repair replace fittings as necessary. 4. Removal and replacement of doors as necessary to facilitate carpets and vinyl replacement. Carpet and bathroom vinyl replacement will take place after the repairs are done (we have organized quotes for this).
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Straight Flush were wonderful to deal with. Very professional and easy to comunicate with. They went above and beyond with the work performed. I will definitely use their services again, highly recommend.
Work carried out by an employee of the company
Reviewed on 17 November 2023
Partner with Builderscrack
Get work