Published: 27 January 2020
Replace existing shower which has a tiled wall, with a flat wall shower and also install new toilet seat.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
We would highly recommend Mike to anyone who wanted a job well done and on time. Even though there were a few minor hiccups Mike was able to deal with in an efficient and workmanlike manner and always made sure he talked us through any minor problems he had to deal with. The job cost came in higher than the original quote but this was because we had extra flashback tiling done in the kitchen. That work was also of a very high standard and has impressed everyone who has called in.
Work carried out by the owner/operator
Reviewed on 23-03-2020
#1 | Tradie 1 |
|
49 jobs | Secured job |
#2 | Tradie 2 | No recent reviews | 7 jobs | No longer in contact |
#3 | Tradie 3 |
|
54 jobs | No longer in contact |
Partner with Builderscrack
Get work