Very small existing bathroom. Would like old bath, toilet, vanity removed. Wall linings removed. Existing window in the bathroom to be downsized which requires cladding to outside wall. New wall linings with insulation. Would like to have a wet floor shower without doing structural work. Will need tiler to put in floor tiles. Installation of new vanity, and sealing of necessary spaces. Plan to install a glass shower with glass wall linings instead of tiling in the shower. Plan to put in a cavity slider and move toilet. Need a builder, tiler, and electrician. Hope to start the project around April.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
4.0
|
Communications |
5.0
|
Kurt and his team were excellent at communicating -- providing good pre-quote advice to meet our needs and design vision. We also appreciated the fully itemised quote provided in good time. The job did not start as scheduled but Kurt maintained regular communication to keep us in the loop. The workmanship was excellent which contributed to the overall finish -- the tiler was impressed by how straight the walls had been made. Kurt coordinated the electrician which was also a big help.
Work carried out by an employee of the company
Reviewed on 05-06-2016
Partner with Builderscrack
Get work