Review

Kitchen basin plumbing

Job image

Job description

Kitchen Renovation
Christchurch

Published: 31 March 2018

The kitchen basin plumbing requires disconnection and plugging off prior to 11 April , then after the install of a kitchen bench top (by another contractor on 11 April) you would be required to return and re-connect pipe plumbing to the new basin which is likely to be slightly offset (cm not metres) from the previous basin. Plumbing includes wastepipe of basin and taps separate hot and cold.Taps will stay at this location and requires removal of front bits only in order for tap pipes to fit through the bench splash back location holes).


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Work done on time and as requested, communication excellent. Would definitely make use of Greg's service again.

Work carried out by the owner/operator
Reviewed on 27-05-2018

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo