Replace the ceiling tiles with gib. Check wall lining and replace any damaged area. Check insulation and install new insulation if necessary. Replace water-damaged window frames, ceiling frame and skirting boards. Remove the carpet. We would like the work to be completed by Labour Weekend if possible.
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
4.0
|
Communications |
4.0
|
Joseph was very knowledgeable and experienced. It was good to see his apprentice get a lot of work experience on the job.
Work carried out by an employee of the company
Reviewed on 15-10-2022
Partner with Builderscrack
Get work