Need drain layer to finish off shed drains and complete to code requirements as well as a soak pit. Drains have been trenched and a pre-dug area for a soak pit (there was supposed to be an existing soak pit as per asbuilts to Council but it wasn't there. Most of the 100mm SW pipe and connections on site - will most likely require a percolation test and sign off
Workmanship |
5.0
|
Cost |
3.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 10-10-2022