Plumber required Thursday the 13th of September. Install new * Floor standing vanity * laundry super tub * Shower head * Remove kitchen taps and block off for new kitchen to be installed Change out some tap washers.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 08-01-2019
Partner with Builderscrack
Get work