Published on 5 April 2023
I need an (approx.) 5.6m3 boulder filled soak pit installed and connected to my existing stormwater system (pipes already installed) to comply with my building consent plans (see images).
#1 | Tradie 1 |
|
28 jobs | No longer in contact |
Partner with Builderscrack
Get work