Active job

Plumb in a new bathroom waste

Job description

Plumbing Renovation
Masterton

Published: 11 December 2014

I have a new bathroom that is partially finished. I think the incoming water supply is hooked up to some parts, but all the waste needs to be hooked into the existing waste pipe. The pipe has been dug up and exposed, and I have all the fittings I was told I required.


Trade professionals

#1 Tradie 1 No recent reviews 26 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo