Published: 12 December 2018
New studio located at 392 black rock road, te ore ore, masterton. Plumbing is in. Toilet and small hand basin to be installed, plus attach water pipe (main pipe from tanks is located close to connector to studio). Toilet, sink and fittings are onsite. Window for completion is Wednesday 19th and 24th December.
#1 | Tradie 1 | No recent reviews | 26 jobs | No longer in contact |
Partner with Builderscrack
Get work