Published on 2 November 2024
Disconnect waste and separate hot and cold water taps. Second visit (after walls relined) connect a mixer tap and waste for the super tub.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Fantastic guys to deal with, great work and very accommodating when unexpected change of plans arose. Can't recommend them enough.
Work carried out by the owner/operator
Reviewed on 25 January 2025
Partner with Builderscrack
Get work