Active job

New solar HWC

Job image

Job description

Hot Water Cylinder Plumbing & Installation
Otaki Beach, Kapiti Coast

Published on 3 August 2021

Install new solar panels and HW tank on coloursteel roof, plumb into existing pipework. Remove existing internal HWC, readily accesible in bathroom. Remove old laundry tub from bathroom, allow time for fixup to the existing wall and then install new (supplied) whb and swivel mixer in the existing location.


Trade professionals

#1
Tradie 1
24 jobs
No longer in contact
#2
Tradie 2
39 jobs
No longer in contact
#3
Tradie 3
122 jobs
No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo