Install new solar panels and HW tank on coloursteel roof, plumb into existing pipework. Remove existing internal HWC, readily accesible in bathroom. Remove old laundry tub from bathroom, allow time for fixup to the existing wall and then install new (supplied) whb and swivel mixer in the existing location.
#1 | Tradie 1 |
|
24 jobs | No longer in contact |
#2 | Tradie 2 |
|
30 jobs | No longer in contact |
#3 | Tradie 3 |
|
105 jobs | No longer in contact |
Partner with Builderscrack
Get work