Published on 23 March 2021
1. Remove the old hot water cylinder and water tank in the attic, and put them in the basement of the house. Install a new hot water system. 2. Change the necessary water supply pipes from low pressure to high pressure. 3. Install secondary water supply to the second sink in the kitchen.
Partner with Builderscrack
Get work