Published on 27 July 2013
I have an existing bathroom where we have taken out the old bath and vanity. I need the replacements installed and plumbing connected etc. The replacements are roughly in the same place as the old ones. Here's how we think it will go, but open to suggestions: Stage 1 (you): * Remove/plug the old bath taps (the new taps will go in the same area but will be deck mount). * Install wall mount 900mm vanity (note, the old vanity was floor mount so the new pipes will need to go inside the wall) * Install and connect vanity mixer. Stage 2 (me): * I'll then install the deck mount shelf for the bath mixer and varnish the floor. Stage 3 (you): * Install and connect the new 4-hole deck mount bath mixer. * Install and connect new freestanding bath. I've photos attached of the existing bathroom, a photo of our new bath, bath mixer, wall vanity and vanity mixer. Timeframes: Stage 1: Early August Stage 2: Mid August Stage 3: Mid/Late August Accreditation: You must be a certified plumber or a licensed plumber working under the guidance of a registered certifying tradesperson. Do a great job and the kitchen is next :)
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Greg is quick to respond, flexible and persisted when the inevitable little problems came up. We are very happy with the end result.
Work carried out by the owner/operator
Reviewed on 28 April 2014
Partner with Builderscrack
Get work