Review

Toilet replacement

Job description

Toilets
Lower Hutt, Hutt Valley

Published on 12 June 2018

We want to replace the toilet with a new one asap. Job must be completed in 1 day between 9am and 3 pm as its the only toilet for the house.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Very good and professional job done. Thanks mate.

Work carried out by the owner/operator
Reviewed on 27 June 2018

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo