I have sent up a new garden tap, laid alkathene pipe (15mm). This needs to be connected to the main plumbing. There are three key tasks: 1. Connect the new pipe to the main plumbing (located at an existing outside tap) 2. Install a gate valve (supplied) at the new connection 3. Pressure test new line and attend to any leaks. All work is outdoors and is likely to involve to minor digging/trenching
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
All completed to requirements set out
Work carried out by the owner/operator