Published on 9 March 2025
Currently water main line and fibre line is attached to old fence which runs 46m along side a drive. Fence has now been removed and new fence will be built later, water main line and fibre are now on ground next to drive. Required Work: Dig a 46m trench 300mm deep into soil along side the drive, then relocate water main line into trench, then fill in trench. Note there is 9m of concrete that will be cut before trenching will start (I will arrange this job). Note that Chorus will need to relocate fibre into trench before it is filled in (I will arrange job and timing with Chorus). Pic 1 shows overview, red line indicating new trench. Pic 2, 3 shows old black fence, blue water main line, yellow spray paint indicating new fence location. Pic 4,5,6 shows ground after fence removed, note concrete will be cut before you trench. Any questions let me know. Thanks!
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Muri and his worker did an awesome job trenching my water main, and I would not hesitate to recommend him to others! Easy and prompt communications, job completed in a timely manor, good price. Recommended.
Work carried out by the owner/operator
Reviewed on 27 March 2025
Tradesperson reply
"Thanks so much Michael, was a pleasure 🙏 ☺️"
Partner with Builderscrack
Get work