Published on 24 September 2020
We are due to have a new kitchen installed shortly and are in the process of removing the existing units. We need to get the gib stopped that was behind the pantry and some of the units. Also, the hole where the existing range hood has been in the ceiling and a bit of tidying in general where top of units meet existing painted surface. Approx 2 metres of full height board and a further 4-5 metres of half height. Gib stopping only. Boards will all be in place. Needs to be done next week 5th to 9th October.
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
4.0
|
Communications |
4.0
|
Excellent work done promptly.
Work carried out by the owner/operator
Reviewed on 22 November 2020
Partner with Builderscrack
Get work