Published on 10 April 2021
Small bathroom, taken back to shell. Is now fully re-gibbed, and requires gib stopping ready for a painted finish. Toilet and handbasin are removed, there's a corner shower tray glued in place. Plywood flooring awaiting Lino. Job Includes: * bathroom ceiling * Bathroom walls (4) * An internal wall (bedroom) also requires stopping on the other side to the bathroom wall. Bathroom Dimensions: 1450mmx2300mm and 2420mm high. Internal wall (bedroom) dimensions: 1900mm x 520mm We’d love this to be done asap!!? Further information: Finishing will include Scotia and skirting boards, and framing around door and window. By tomorrow’s end, changes will include: * the acrylic shower corner walls will be glued in above the shower tray * the black drain near the ceiling (pictured) will be boxed by gib (50x30x5cm)
Partner with Builderscrack
Get work