Review

New Townhouse - Gib Stopper required.

Job image

Job description

Interior plastering
Tawa, Wellington

Published on 9 May 2020

New Townhouse 106m2 three bedroom. Good quality work required.


Review

Workmanship
3.0
Cost
5.0
Schedule
2.0
Communications
3.0

Overall a nice man to deal with but the quality of work was questionable. I was lucky enough to have them return numerous times to fix up areas the painters were not happy with.

Work carried out by the owner/operator
Reviewed on 14 September 2020

Tradesperson reply
"This townhouse owners had trick me to do a detail job at the same cost he refuse to pay more for detail work he told me it all square stop . I attack with photo for all of you to see now you can tell me who will do all the flex Ceilling work on Every room include closet also have flex on Ceilling . I am not happy with this owner. please think again and be careful i lost lots money for this detail work paying peanut should get a monkey job . I had to finish this work at level 5 not level 4"

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo