Install second layer of fire GIB and plaster inside factory
Job description
Interior plastering
Takanini, Papakura
Published on 14 March 2025
A second layer of fire GIB is required to be installed inside factory of two levels.
Need a second layer fitted on top of existing GIB and plastered ready for painting.
Trade professionals
#1
Tradie 1
8 jobs
No longer in contact
#2
Tradie 2
147 jobs
No longer in contact
#3
Tradie 3
53 jobs
No longer in contact
Get connected now
with NZ’s largest trade professional network