Published on 1 May 2024
I've just had an old gas heater removed and have been left with a bit more to the patching than my gas fitter could do. The hole is just between 2 studs and needs new GIB however the original installer also cut a chuck of the skirting board out so that needs to be replaced. I can get the replacement skirting board prior to the job.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Good clean patch job. Good communication esp about the materials that would be needed so I could quickly and easily buy them ready for him to work with.
Work carried out by the owner/operator
Reviewed on 16 May 2024
Partner with Builderscrack
Get work